Sand Hutton coach
<-- Index | Showing 1-12 of 28 pictures | Next -->
A composite view of the first build as at 30 Nov.  The following photo sequence forms a
A composite view of the first build as at 30 Nov. The following photo sequence forms a "blog" of the build process.
800x600
01_S_H_coach_compos.jpg
2007-11-30 20:10:12
Side view of first build
Side view of first build
800x600
02webPB300797.jpg
2007-11-30 20:10:28
The end with brolly and boot racks. Note veranda grill which was printed onto inkjet transparency film.
The end with brolly and boot racks. Note veranda grill which was printed onto inkjet transparency film.
494x600
03webPB300798.jpg
2007-11-30 20:10:40
Underside as at 30 Nov 07 showing Tri-ang Weltrol as sub-base
Underside as at 30 Nov 07 showing Tri-ang Weltrol as sub-base
800x350
04webPB300806.jpg
2007-11-30 20:13:59
The construction starting point, three printed sheets plus an old Tri-ang Weltrol wagon for the underframe.  The sheets created from NGRS drawings of the original.
The construction starting point, three printed sheets plus an old Tri-ang Weltrol wagon for the underframe. The sheets created from NGRS drawings of the original.
800x600
05web_PB260757.jpg
2007-11-26 15:02:09
Close up 1
Close up 1
800x600
06web_PB260758.jpg
2007-11-26 15:02:45
close up 2
close up 2
800x600
07web_PB260759.JPG.jpg
2007-11-26 15:02:58
Building starts 1
Building starts 1
800x600
10web_PB270761.jpg
2007-11-27 12:53:28
Building starts 2
Building starts 2
800x658
11web_PB280764.jpg
2007-11-28 16:30:15
Balsa wood framing added to underside
Balsa wood framing added to underside
800x600
15_webPB280772.jpg
2007-11-28 22:55:23
First glazing added but forgot to paint card edges before fitting the glazing
First glazing added but forgot to paint card edges before fitting the glazing
800x565
20web_PB280768.jpg
2007-11-28 20:40:00
showing problems of
showing problems of "edging in" with glazing in place
800x600
21web_PB280769.jpg
2007-11-28 22:53:49